Choose a warehouse automation system manufacturer by matching its engineering capabilities to your inventory, order profile, building, and service requirements—not by comparing equipment prices alone. Ask each supplier to assess your workflows, explain how its proposed system meets defined performance targets, and document the equipment, software, installation scope, and ongoing support. For a storage-led project, also confirm that the manufacturer can coordinate automation with pallet racking, shelving, loads, and material-handling equipment. At HEGERLS, we recommend evaluating the complete solution and its integration responsibilities before selecting a supplier.
A manufacturer cannot recommend a suitable system based only on warehouse size or a request to “automate storage.” First identify the operational problem you want to solve, such as limited storage density, excessive travel, slow replenishment, or difficulty managing order peaks. Decide which outcomes matter most and how you will measure them. These goals give every supplier a common basis for proposing and explaining a solution.
Build a project brief that describes your building, inventory, processes, and constraints. Useful inputs include clear height, floor plan, column positions, dock locations, floor information where available, and any fire-protection or egress requirements. Include SKU counts, product dimensions and weights, storage media, inbound and outbound workflows, order profiles, and seasonal variations. If you have operating records, provide a representative period—for example, the previous 12 months—so suppliers can consider normal and peak demand rather than relying on a single snapshot.
Describe the work as it happens: receiving, putaway, replenishment, picking, packing, and dispatch. Identify the number of shifts and the points where delays or manual work accumulate. Separate confirmed information from estimates, and flag planned changes such as new product lines or a different order mix. Clear assumptions reduce the risk that two proposals appear comparable while solving different problems.
Warehouse automation can involve storage structures, conveyors, lifts, shuttle systems, automated guided vehicles, autonomous mobile robots, picking technologies, and warehouse control or management software. A manufacturer may supply some components directly and integrate others through partners. Ask which parts it engineers, manufactures, installs, programs, and supports, and identify who is accountable for the complete system.
Consider inventory variety, product dimensions, load characteristics, order lines, and replenishment patterns when assessing system fit. High-density storage may suit operations with appropriate inventory profiles and handling processes, while more selective storage can support easier access to a wider range of goods. Automation can improve a workflow only when the design reflects how inventory moves through the facility. Ask the supplier to explain why its proposed configuration fits your specific flows and where it may not.
For racking and shelving projects, verify that the proposed storage layout accounts for intended loads, handling equipment, clearances, and site conditions. Request the applicable design information and load documentation for the specified configuration, and confirm who checks the building and operating requirements. Do not assume that components can be mixed or modified without review. Any proposed future changes should be assessed by qualified parties before implementation.
Translate broad goals into measurable project requirements. For example, state the required peak throughput in lines per hour or pallets per hour, as appropriate, and define the conditions under which that target must be demonstrated. Specify the intended operating schedule in hours per day and describe the workload mix used in the calculation. These are project-specific measurement units, not universal performance benchmarks.
Ask manufacturers to distinguish guaranteed values from estimates and identify factors that can affect performance, such as SKU distribution, order mix, staffing, system availability, and upstream processes. Request a clear explanation of the calculation method and the customer data used. A precise target is useful only when both parties agree on the scope and measurement conditions.
A credible supplier should be able to discuss the project beyond the product catalogue. Assess how it gathers site information, develops a layout, checks interfaces, manages design changes, and coordinates installation. Ask who is responsible for civil works, electrical connections, fire-protection coordination, controls, software integration, and commissioning. A responsibility matrix can reveal gaps before they become schedule or cost issues.
Automation often depends on information exchanged among equipment, warehouse software, and business systems. Ask which interfaces are included, what information must be provided by your IT team, and how exceptions such as unavailable inventory or equipment stops are handled. Confirm whether the proposal includes software configuration, testing, training, and documentation. If third-party systems are involved, identify the named parties and the process for resolving interface problems.
You will get efficient and thoughtful service from HEGERLS.
Request the technical documents relevant to the proposed equipment and project, and verify that they match the final configuration and site requirements. Discuss operating procedures, access control, emergency response, maintenance access, and safety responsibilities during installation and operation. Avoid relying on broad statements such as “fully compliant” without knowing which requirements apply and what documentation will be supplied. Agree on how design revisions, substitutions, and scope changes will be reviewed and approved.
Compare total project scope rather than the headline equipment price. Check whether the proposal includes engineering, software, installation, commissioning, training, freight, spare parts, and service, and note all exclusions. Ask suppliers to state payment milestones, quotation validity, estimated lead time, and the assumptions behind the schedule. Lead time can depend on final design approval, component availability, site readiness, and other project-specific factors, so request a schedule with dependencies rather than treating a single date as guaranteed.
Support arrangements matter after handover. Ask how technical issues are reported, which support services are available, what response commitments are included in the contract, and whether parts or trained technicians are accessible for the equipment in your region. Clarify warranty scope and exclusions in writing. Also ask what operating and maintenance training your team will receive and what documents are delivered at project completion.
Where practical, ask shortlisted manufacturers to walk through a representative order or material flow using your data. This helps your team see how the design handles normal work, peak periods, exceptions, and recovery from interruptions. If a supplier cannot validate a particular requirement before contract, record how and when it will be verified. A shared acceptance plan makes the final decision more transparent.
More automation is not automatically a better fit. A complex solution can introduce additional integration, maintenance, and training needs, while a simpler change to storage layout or process design may address the main constraint. Ask suppliers to explain alternatives and the trade-offs of each. Select the level of automation your operation can use and support.
One bidder may include software and installation while another quotes equipment only. One may calculate throughput using a different order mix or operating schedule. Normalize the assumptions and scope before judging price or performance. Ask for revised proposals when a material difference cannot be reconciled.
Support requirements, spare parts, training, and expansion options affect long-term usability. Discuss how the system could accommodate changes in SKU mix, volume, or building use, while recognizing that modifications may require engineering review. Do not treat future compatibility as guaranteed unless it is specifically described in the proposal. Document what is included now and what would require a later project.
As a supplier focused on stacking racks and shelves, HEGERLS can support buyers evaluating storage structures as part of a broader warehouse automation plan. We can discuss storage requirements, project information, and how racking or shelving needs to coordinate with the planned warehouse workflow. The right scope depends on your site, inventory, equipment, and project responsibilities, so requirements should be reviewed before a final design is selected.
When you contact HEGERLS, share your facility layout, product and load details, operating goals, and any automation concepts already under review. We can help clarify the storage-related questions to resolve and identify information needed for a project discussion. For complete automation projects, confirm the roles of all equipment, software, and installation partners so the final solution has clear technical and service ownership.
The best warehouse automation system manufacturer is the one that can translate your operational data into a clearly scoped, technically suitable, and supportable solution. Before selecting a supplier, compare proposals against the same requirements, verify performance assumptions, review integration and safety responsibilities, and understand the full commercial and service scope. Your next step is to prepare a project brief and request proposals that document assumptions, exclusions, acceptance criteria, and delivery responsibilities. If storage structures are part of the project, include those requirements early and invite HEGERLS to discuss how racks and shelves can fit the warehouse plan.